Home / Products / Propulsion Systems / Stern Gear Assemblies

STERN GEAR

Marine Stern Gear Assemblies for Coordinated Shaft-Line Projects

ERBA Marine coordinates stern gear around hull construction, shaft dimensions, machinery mounting and lubrication. Drawings and measurements allow the stern tube, bearings, gland and related interfaces to be reviewed together.

Final arrangement depends on hull material, engine mounting, shaft support, lubrication and available space.

Bronze water-lubricated marine stern gear assembly with shaft and propeller

Project-matched stern gear

Steel, bronze and GRP arrangements with suitable bearings, glands and sealing interfaces.

ERBA-Managed Supply

Technical clarification, quotation and supply through ERBA Marine.

Drawing-Led Review

Interfaces checked from verified project information.

Newbuild & Replacement

Support for planned projects, refits and replacement scopes.

GCC Coordination

Regional commercial and delivery coordination.

STERN GEAR RANGE

Stern tubes, glands and bearings selected as one system.

Choose the closest starting point; ERBA Marine will confirm the complete interface and component scope.

Group of custom-built marine stern tube assemblies

Custom Steel Stern Tubes

Oil-lubricated steel arrangements can be coordinated with bearing, seal and oil-circulation requirements.

Bronze water-lubricated marine stern gear assembly with shaft and propeller

Bronze Water-Lubricated Stern Gear

Bronze stern tube configurations with water-lubricated bearings and a suitable gland arrangement.

GRP marine stern gear assembly with shaft bracket and propeller

GRP Stern Gear Assemblies

GRP stern tubes reviewed for compatible composite hull and installation arrangements.

Red and bronze marine propeller shaft gland

Marine Shaft Glands

Water-lubricated, flexible inboard and grease-lubricated gland arrangements selected for the installation.

Water-lubricated cylindrical marine shaft bearings in multiple sizes

Marine Shaft Bearings

Cylindrical and flanged water-lubricated bearings sized from shaft, housing and lubrication data.

SYSTEM INTERFACES

Stern gear selection follows the shaft line and hull.

A stern tube cannot be selected from shaft diameter alone. Length, supports, mounting, bearings, gland, lubrication and hull penetration must agree.

Installation context

The hull and machinery arrangement determines the practical stern gear route.

Replacement evidence

Accurate installation data is essential where the original drawing is missing.

TECHNICAL ENQUIRY CHECKLIST

What to send for a useful propulsion review.

Complete information reduces unnecessary clarification and helps ERBA Marine prepare a more accurate technical and commercial response.

Vessel & machinery

Dimensions & project scope

PROJECT PROCESS

A clear route from enquiry to coordinated supply.

Custom and replacement propulsion equipment benefits from documented technical checkpoints.

PROCESS

1. Send the project data

Share vessel, machinery, dimensions, photos, drawings and required scope.

PROCESS

2. Clarify the interfaces

ERBA Marine identifies missing inputs and checks connected components.

PROCESS

3. Confirm the proposal

Configuration, materials, documentation, commercial terms and delivery are agreed.

PROCESS

4. Coordinate supply

ERBA Marine remains the customer-facing contact through the confirmed supply scope.

Important: Published examples describe available solution routes. Final dimensions, materials, tolerances, class or inspection scope, price and delivery are confirmed only in ERBA Marine’s written quotation.

FREQUENTLY ASKED QUESTIONS

Stern Gear Assemblies FAQs

Practical answers for selection, replacement and project planning.

Yes. The scope can include the stern tube, bearings, gland or seal interfaces and related shaft-line components, depending on the confirmed requirement.

The choice depends on hull construction, shaft arrangement, installation method, dimensions and project requirements. ERBA Marine reviews the vessel data before recommending a route.

It may be possible, but accurate measurements and clear installation photographs are essential. A verified drawing or dimensional survey may be required for complex arrangements.

Yes. Water-lubricated, flexible and grease-lubricated arrangements can be reviewed. The correct option depends on shaft movement, machinery mounting, lubrication and the installation.

Yes, when shaft diameter, bearing housing, overall length, lubrication method and required fit are confirmed.

PROJECT-SPECIFIC ENQUIRY

Request an ERBA Marine Stern Gear Assemblies review.

Send the strongest available technical information. ERBA Marine will review the requirement and identify any missing dimensions or interfaces before quotation.

Request Stern Gear Selection

Fields marked * are required. Drawings and photographs are strongly recommended for replacements.

Your technical and contact information is sent only to ERBA Marine’s website enquiry recipients for follow-up.