PROTECTED ELECTRIC THRUSTERS
CT125-IP Ignition-Protected Tunnel Thruster Reference
CT125-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
MODEL GALLERY
CT125-IP reference images
Images identify the reference family and current configuration routes. Final appearance and included components depend on the quoted product code.
Max Power CT125-IP additional product view 1 for bow or stern thruster selection reference
Max Power CT125-IP additional product view 2 for bow or stern thruster selection reference
REFERENCE DESCRIPTION
Ignition Protected Thruster CT125-IP
CT125-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
Reference-family role
CT125-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
- Fixed tunnel installation
- Ignition-protected electric family
- Exact certification and zone suitability require verification
Quotation boundary
ERBA may quote this reference family, another supported manufacturer or a project-configured solution after technical review.
- No exclusive-supplier implication
- No availability promise from catalogue presence
- Exact make and model stated in writing
PUBLISHED REFERENCE FACTS
Use verified values as selection inputs
Only internally consistent current manufacturer-reference values are shown. They are not vessel-performance guarantees.
Electrical supply
DC • 24 V
Nominal tunnel diameter
185 mm
Published vessel guidance
35–58 ft
Published configuration 1
24 V • 8.58 kW
Duty boundary
No family-level run-time entitlement is assumed; confirm the exact system and installation limits in writing.
CURRENT PRODUCT-CODE VARIANTS
CT125-IP variant routes
Product codes distinguish voltage, material, motor or other configuration details. Confirm the exact row and latest manufacturer documents before quotation.
Code 317616
MAXPOWER THRUSTER TUNNEL CT125-IP 24V
- Exact product-code verification required
- Availability and included scope confirmed by quotation
TECHNICAL BOUNDARY
Items that require written confirmation
Conflicts and compatibility limits are retained so reference data is not converted into an unsupported promise.
- Fixed tunnel installation
- Ignition-protected electric family
- Exact certification and zone suitability require verification
- Current official records disagree on thrust (115 versus 117 kgf); no exact thrust value is normalized.
- Catalogue reference does not establish ERBA stock, authorized-dealer status, warranty route, regional approval or guaranteed availability.
- The written quotation confirms the final manufacturer, model, documents, warranty path, delivery and included services.
RELATED REFERENCE FAMILIES
Compare adjacent Ignition-Protected Thrusters routes
Open related pictured models, then send the complete vessel and duty data for final selection.
CT35-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
CT45-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
CT100-IP is an ignition-protected electric tunnel-thruster family. Suitability, certification and installation-zone requirements must be checked against the exact product code and project.
SELECTION INPUTS
Selection data for CT125-IP
Confirm the vessel, installation geometry, power source, controls, duty and documentation needs before applying any reference value.
Vessel & duty
Define hull, displacement, windage, operating conditions and manoeuvring duty.
- Vessel type, newbuild / retrofit / replacement and operating area
- Length overall, beam, draft, displacement and loading condition
- Hull material, thickness and available structural drawings
- Windage profile, superstructure and expected manoeuvring conditions
Installation
Confirm tunnel or retractable geometry, immersion, structure, drainage and access.
- Bow, stern or combined requirement and desired operating duty
- Existing or proposed tunnel diameter, position, immersion and clearances
- Available internal space, access, drainage and maintenance route
- DC voltage and battery capacity or AC supply, phase and frequency
Power & scope
Coordinate electrical or hydraulic supply, controls, documents and delivery boundary.
- Hydraulic pressure, flow, return, cooling and filtration if available
- Control stations, joystick, proportional control and remote requirements
- Flag, class, client documentation and inspection requirements
- Delivery location, schedule and installation / commissioning boundary
FREQUENTLY ASKED QUESTIONS
CT125-IP Ignition-Protected Tunnel Thruster Reference questions
These answers preserve the technical-review and written-quotation boundary for every reference route.
No. The detailed catalogue pages use current Max Power models as clear reference examples because ERBA Marine deals with this equipment, but ERBA can also review other supported manufacturers or a project-configured package. The quotation confirms the final make and model.
No. Published values are manufacturer-reference data and depend on the exact variant, voltage or hydraulic supply, installation geometry, immersion and operating conditions. ERBA Marine confirms the quoted configuration only after technical review.
Yes. Send the existing model and nameplate, tunnel or hull-opening dimensions, vessel drawings, power information, controls, photographs and the required new duty.
Continuous or extended duty must not be assumed. Duty limits depend on the exact electric or hydraulic system, cooling, batteries or power pack, controls, installation and current manufacturer instructions.
No. It is a current manufacturer-reference family page. Vessel data, installation geometry, duty, power, controls, documents and availability must be reviewed before the written quotation confirms the final make, model and product code.
TECHNICAL ENQUIRY
Request a review for CT125-IP Ignition-Protected Tunnel Thruster Reference
Send the vessel, installation, power and duty information available. ERBA Marine will confirm the missing data and define the quoted make, model and supply boundary.